Hello everyone,
For GTS Trade preference, customer requests to have two Administrative Units (AU1 and AU2) and cross-plant scenario
All EU manufacturing plants from the customer would be assigned to AU1 and all its Distribution centers to AU2
Both Manufacturing plants and DC plants can deliver to the final customer
First case: Manufacturing plant (MAN1) delivers finished products to final Customer so here, the standard functionality for TP applies. LTVD + calculation works here, no problem
Second case: When calculation and preference determination is done at manufacturing plant level, system determines what is the status of the finished product (preferrential or not), then the finished product is transferred to the DC and then to the final customer
When the part is transferred from MAN1 to DC1, since DC1 is in a different AU, we need to make another calculation for the finished part in the DC but how could we do that? (Is there an LTVD between plants? (LTVD with MAN1 being the vendor) and how would be the calculation at DC1 determined?
I guess we might need to do a custom development but before considering this, I wanted to have your insights
Thanks in advance for your feedback
Kind Regards,
Philippe